852.2903 0366 Mon–Fri 09:00–18:00 9/F, Cable TV Tower, 9 Hoi Shing Road, Tsuen Wan, N.T., Hong Kong
Home/Resources

Resources

The things we explain most often during quotation and delivery, written down: how to choose a circuit, what to check in a migration, how early to plan a move. No form wall.

Selection guideChecklistsTechnical notesGlossary

1. Choosing an enterprise circuit

The usual mistake is using price or a headline bandwidth number as the only criterion. The right order is purpose → symmetry and exclusivity → bandwidth and price.

Four questions first

  • Will this line serve external users? If yes (website, mail, VPN), you need fixed IPs and higher stability — consider DIA.
  • Is your traffic symmetric? Heavy upload (backup, video, camera feeds) will bottleneck on shared broadband.
  • What does an hour of downtime cost? If it is unacceptable, you need resilience design, not merely a more expensive line.
  • Who follows up? If nobody does, fix that before buying a premium circuit.
Your situationSuggested directionAvoid
Under 10 staff, email and browsingBusiness broadband plus 4G backupDIA is unnecessary
Public website or VPN accessDIA with fixed IPsDynamic-IP broadband
Multiple branches needing interconnectPoint-to-point or SD-WANStacking broadband VPNs
A single line that keeps failingFind the cause and physical path firstSimply upgrading the same line
Cross-border operationsCross-border circuit or SD-WAN plus local internetAssuming cross-border costs the same as local
The most common misconception: comparing a 1000M broadband service with a 100M dedicated line and concluding the dedicated line is overpriced. The bandwidth nature (shared vs exclusive), symmetry, SLA and equipment responsibility are all different — headline numbers are not comparable.

2. Business email migration checklist

Before cutover

  • Account count, mailbox sizes, shared mailboxes, aliases and distribution groups counted
  • DNS control confirmed (or ownership established)
  • New platform accounts created with a consistent naming convention
  • SPF, DKIM and DMARC configured and validated
  • Cutover window chosen (low traffic, people available)
  • All staff notified of timing and required actions
  • Mobile and desktop setup guides prepared
  • Parallel running period and rollback plan agreed in writing

Within 24 hours after

  • External and internal send/receive tested with attachments
  • Mobile and desktop each tested
  • Junk folder checked for false positives
  • Signatures, auto-replies and shared mailbox permissions confirmed
  • Aliases and groups still delivering
  • SPF / DKIM / DMARC results checked
  • Calendar and contacts synchronised
  • Issues logged with a named owner

3. Office relocation IT checklist

WhenTaskWhy it cannot wait
T-10 weeksConfirm new site, check coverage, place orderCircuits and installation are the longest lead items
T-8 weeksSite survey, server room and cabling planChanges after fit-out begins cost multiples
T-6 weeksEquipment list and purchase, cabling tenderDelivery and installation must overlap
T-4 weeksNetwork and telephony design signed off, access control and CCTVInvolves multiple contractors
T-2 weeksPre-configure and label equipment, packMove day should be transport and patching only
T-1 weekOld site handover, circuit termination, data disposalAvoid extra months of billing and data exposure
Move daySwitch over zone by zone, test eachA single big-bang cutover is the riskiest option
T+1 weekAcceptance, snagging, old equipment disposalMost issues surface on day two

4. Glossary

TermPlain explanation
DIADedicated Internet Access — exclusive, symmetric internet access with a contractual SLA.
SLAService Level Agreement — availability, response and restoration commitments.
MPLSA traditional enterprise private network technology: stable but costly and slow to provision.
SD-WANSoftware-defined aggregation of multiple links with per-application routing and central management.
CPECustomer Premises Equipment — the network device located at your site.
Last mileThe segment between the building and the carrier network.
SPF / DKIM / DMARCThree email authentication mechanisms that prove sender identity and reduce impersonation.
MFAMulti-factor authentication — a second proof at sign-in, such as a code on your phone.
EDREndpoint detection and response — detects behaviour that traditional antivirus misses.
RTO / RPORecovery time objective / recovery point objective — the two measures of backup and resilience.
Need a formatted copy? These guides can be provided as PDF or Word for internal circulation or bid documents. Tell us which items you need through project enquiry.

Have a project in hand? Start with the requirements.

Tell us the purpose, location and timing. We will come back with what is feasible, what it depends on, and an indicative price range.

Submit a project enquiry